STATE FILING
BEFORE THE
GEORGIA PUBLIC SERVICE COMMISSION


In Re:

Consideration of BellSouth Telecommunications, Inc.’s Entry
Into InterLATA Services Pursuant To Section 271 of the
Telecommunications Act of 1996
Docket No. 6863-U

Review of Cost Studies, Methodologies, and Cost-based
Rates for Interconnection and Unbundling of BellSouth
Telecommunications Services
Docket No. 7061-U

BellSouth Telecommunications, Inc.’s Statement of Generally
Available Terms and Conditions
Under Section 252(f) of the
Telecommunications Act of 1996
Docket No. 7253-U

Performance Measurements for Telecommunications,
Interconnection, Unbundling and Resale
Docket No. 7892-U

Investigation into Development of Electronic Interfaces for
BellSouth’s Operational Support Systems
Docket No. 8354-U

Generic Proceeding to Establish Long Term Pricing and Policies
For Unbundled Network Elements
Docket No. 10692-U


PETITION TO ESTABLISH A COMPREHENSIVE PROCEDURE TO
FURTHER LOCAL COMPETITION IN GEORGIA


Association of Communications Enterprises (ASCENT) f/k/a Telecommunications Resellers
Association, AT&T Communications of the Southern States, Inc. (“AT&T”), Competitive
Telecommunications Association (“CompTel”), DIECA Communications, Inc. d/b/a Covad
Communications Company, e.spire Communications, Inc. (“e.spire”), ICG, MGC Communications,
Inc., d/b/a Mpower Communications Corp. (“Mpower”), MediaOne Telecommunications of
Georgia, LLC (“MediaOne”), NEXTLINK GEORGIA INC, Southeastern Competitive Carriers
Association (“SECCA”), Sprint Communications Company, L.P. (“Sprint”), US LEC of Georgia,
Inc., (hereinafter referred to collectively as “named CLECs”) hereby move this Commission
to establish a comprehensive procedure to complete the opening of the local
telecommunications market to competition. In particular, this Commission should review
BellSouth’s compliance with the requirements of the Telecommunications and Competition
Development Act of 1995 (“the Georgia Act”) and the Telecommunications Act of 1996 (“the
Act”).

I. INTRODUCTION

1. BellSouth is Focused Upon 271 Long Distance Entry and Not Upon Opening the Local
Market to Wide Scale Competition.

As this Commission is aware, to date, there has been some progress in prying open Georgia
local telephone market to competition. That progress is due to directives of this
Commission, not because of any voluntary steps taken by BellSouth. Instead, BellSouth has
focused solely upon obtaining in-region long distance entry under Section 271 and
attempting to chip away at Commission decisions that encourage competition. A slew of
recent filings by BellSouth, both before this Commission and in Federal Court,
demonstrates this point. These filings include three (3) revisions to BellSouth’s
Statement of Generally Available Terms and Conditions (“SGAT”), three (3) sets of
unbundled network element (UNE) cost studies, a revised TAFI and LEO-IG Guide, an
affidavit by Keith Milner addressing the 271 fourteen (14) point competitive checklist and
revisions to both the Master Test Plan (“MTP”) and Supplemental Test Plan (“STP”) in
conjunction with the Third Party Test (“TPT”). These unilateral filings reveal that
despite significant attempts by this Commission in forcing BellSouth to comply with the
terms of both Acts, BellSouth has failed and, in many instances, simply refused to take
the actions necessary to irreversibly open the local telecommunications market to
competition. As always, these filings either support BellSouth’s 271 efforts (i.e., SGAT
revisions and Affidavit by Keith Milner) or undercut pro-competitive Commission decisions
(i.e., cost studies that do not comply with any Commission Order).

Despite Commission efforts, BellSouth continues to stymie attempts by CLECs to compete
fully in the marketplace. This is evidenced by recent cost studies filed by BellSouth
that contain new rates as well as rates for new elements this Commission has never
approved, interim results from the TPT which show significant problems with almost every
area under review, BellSouth’s failure to propose comprehensive performance measurements
and self-enforcing penalties which can gauge and enforce parity of service and BellSouth’s
failure to comply with the FCC’s Advanced Wireline Services Order on collocation. If
BellSouth truly intended to provide CLECs with a meaningful opportunity to compete on a
level playing field, BellSouth would adhere to the letter and spirit of both Acts, as well
as to the Commission’s previous orders in dockets addressing local competition issues.
Rather than treating CLECs as business partners, BellSouth treats them as competitive
adversaries. As a result, CLECs are forced to seek Commission intervention on most
business and customer affecting issues to which BellSouth should readily agree.

This Commission should not let BellSouth continue to stand in the way of CLECs vying to
provide competitive offerings. Additional Commission intervention is needed to “nudge”
BellSouth to fully open the local market to competition.

2. Additional Generic Proceedings on UNE costs, OSS Performance Measurement and
Collocation Issues can help Break Through Impediments CLECs Face in Serving all Local
Customers.

As previously noted herein, BellSouth has “papered” this Commission with various documents
since January 31, 2000. However, these documents are 271 related pleadings, not ones that
advance competition. This Commission must continue to build upon its policy of fostering
local competition in Georgia by enforcing the terms of its UNE Cost Orders as well as by
directing BellSouth to take action on performance measurements, collocation and OSS
issues. CLECs should have the opportunity to point out the flaws in the cost studies as
well as comment upon the revisions to the SGAT. Updated business rules and documentation,
cost studies and information contained in revisions to the SGAT are all crucial for CLECs
who rely upon BellSouth systems and services to serve their customers. The Commission
therefore needs CLEC input on the recent filings and time to review these filings to
determine whether BellSouth’s proposals are in compliance with the Act. All new cost
studies and rates, SGAT revisions, performance measurement proposals, collocation
issues and results from the TPT should be analyzed by all of the parties. The Commission
should structure its decision-making process with the goal of breaking down the barriers
and impediments for CLECs trying to serve local customers. BellSouth should not be
permitted to dictate to CLECs what is required and needed to serve CLEC customers without
formal review by the Commission. A comprehensive proceeding would include a review of all
of the filings and issues previously noted as well as a complete review and analysis of
the results of the TPT to ensure that CLECs are accorded due process by full participation
at a hearing. Any procedural method other than a hearing would limit the Commission’s
ability to make a full and fair factual determination on BellSouth’s recent filings.

Therefore, the named CLECs propose that this Commission establish generic hearings in open
dockets on four (4) important issues: 1) cost, 2) OSS at the conclusion of the TPT, 3)
collocation, and 4) performance measurements. However, the named CLECs supporting this
petition do not propose eliminating any of the specific issues raised by CLECs in their
individual arbitrations. But, this Commission would save valuable time and resources by
addressing the broad issues raised in this Petition in generic proceedings. To ensure
that this Commission is fully aware of the reasons the named CLECs believe generic
proceedings are not only necessary, but required, the issues and problems associated with
BellSouth’s OSS, UNE costs, collocation policies and performance measurements plan are
outlined below.


II. PERFORMANCE MEASUREMENTS

The Commission Should Adopt a Comprehensive Performance Measures Methodology for
Georgia.

During the infancy stage of the Act, the performance measurements and disaggregation
ordered by this Commission on May 6, 1998 in Docket No. 7892-U (In Re: Performance
Measurements for Telecommunications, Interconnection, Unbundling and Resale
) (the “May
6, 1998 Order”) provided a beginning baseline to gauge BellSouth’s performance. That last
proceeding on performance measurements was over three (3) years ago. Since that time
CLECs have obtained a wealth of experience in what it takes to enter local markets. This
base of knowledge has provided CLECs and this Commission with a greater level of expertise
on what needs to be measured and how it should be measured. By current standards, the May
6, 1998 Order does not go far enough to establish a comprehensive performance measures
plan for Georgia. For example, the May 6, 1998 Order does not address what statistical
methodology to use when comparing BellSouth’s results to CLEC results. It is evident that
without the use of a quantitative methodology, BellSouth is able to camouflage its poor
performance for CLECs, resulting from the difference between the performance it provides
to its retail operations compared to the performance it delivers to CLECs’ customers. This
additional marketplace knowledge can easily be translated into the elements that are
needed for an effective performance measurements methodology— including a self-enforcing
remedies plan--that could build upon and exceed the work undertaken by the Florida, Texas
and Louisiana Commissions.

A. BellSouth’s Current SQM does not Capture Essential Data Needed to Determine
Parity.

BellSouth’s current SQM clearly is incomplete. For example, BellSouth’s SQM contains no
measure of its performance on “hot cuts”. Poor “hot cuts” have left some customers
without service. Similarly, BellSouth offers no measure for order acknowledgement, yet
order acknowledgement has been shown to be one of the most effective and early signals
that an order will or will not be provisioned on time. Each of these activities have
significant impacts on customers and their impressions of the service they are receiving
from CLECs.

CLECs have developed measures for key activities that are not currently captured in
BellSouth’s SQM. These measures are in addition to those in the early list of measures
contained in the Local Competition User’s Group (“LCUG”) document, Version 7.0, released
in April of 1998. These additional measures will capture performance data in such
critical areas as “hot cuts”, xDSL, and order acknowledgements. Further, much additional
work has been done to identify the appropriate statistical methodology that should be
employed so that reliable comparisons of results are made and random variations are
appropriately factored. And, the recent loop provisioning problems that Bell Atlantic-
New York has experienced highlight the crucial need for a remedies plan. Such a plan must
be triggered automatically and require payments significant enough to be an incentive to
BellSouth to correct performance failures quickly and permanently when performance
failures reach the designated level. None of these issues are appropriately addressed in
BellSouth’s SQM.

The recent experiences of thousands of CLEC customers in New York who cannot get
loops provisioned, or even confirmation that their orders are in progress, underscores the
need for this Commission to adopt a comprehensive performance measure methodology after a
hearing on the matter. Customers who lose service complain to the Commission and CLECs’
hard-earned reputations are instantly destroyed when the incumbent provider, in this case
BellSouth, does not perform. As far as the customer is concerned, it does not matter
that BellSouth failed to properly provision or even lost the order. The only thing that
matters is that the telephone is without a dial tone--and the CLEC gets the blame. This
Commission can ensure that neither CLECs nor their customers must face this situation by
setting an appropriate set of measures that are sufficiently disaggregated, with standards
for comparing performance, and a remedies provision so that the right data is captured for
monitoring BellSouth’s performance and assisting CLECs in achieving parity of service with
BellSouth’s retail customers.

B. BellSouth’s Current SQM Lacks Key Requirements.

For a performance measurements plan to be effective, there are eight key characteristics,
which are as follows:
1. A comprehensive set of comparative measurements that monitors all areas of
support, (pre-order, ordering, provisioning, collocation, maintenance & repair, operator
services, directory assistance, bona fide requests and billing).
2. Detailed documentation of measurements and appropriate methodologies
(calculations, business rules, and exclusions).
3. Sufficient disaggregation of measurement results.
4. Performance standards (retail analogs or benchmarks) that are pre-specified and
non-discriminatory.
5. A sound quantitative methodology (statistical process) for comparing CLECs’
support to the analogous support that BellSouth provides to its operations.
6. Initial and periodic validations (audits) of performance measurement processes and
data.
7. Performance results reports and access to the raw data underlying BellSouth’s
reported results.
8. A system of self-effectuating consequences (a remedies plan) for poor performance.

BellSouth’s SQM fails to appropriately address these eight key requirements.
BellSouth’s SQM has numerous deficiencies including: (1) an inadequate set of defined
measures (i.e., no measure for “hot cuts,” no measure for xDSL services, no measure for
acknowledging receipt of a customer’s order from a CLEC); (2) inadequate calculations,
business rules, and exclusions; (3) insufficient levels of disaggregation (allowing
BellSouth to hide discriminatory performance); (4) inappropriate retail analogs and
benchmarks (also allowing BellSouth to hide discriminatory performance); (5) an inadequate
audit policy (will not allow the Commission or CLECs to verify how and whether the plan
actually works as BellSouth claims); (6) inadequate access to the raw data underlying some
of its reports (prohibits review of a key ingredient—BellSouth’s underlying data--for
confirming that BellSouth’s reported results are accurate); and (7) a remedies plan that
is too weak to incent proper marketplace behavior.

C. A Generic Hearing to Adopt Comprehensive Performance Measurements and Self-
Enforcing Penalties would Save Commission Time and Resources.

In the course of re-negotiating interconnection agreements, several CLECs in Georgia have
proposed to BellSouth provisions for performance measurements. BellSouth has not accepted
those proposals or agreed to incorporate appropriate provisions into its SQM. BellSouth
has refused to negotiate any form of self-effectuating enforcement remedies, although they
have made proposals to the FCC. As a direct result of this refusal, several CLECs have
had to file arbitration petitions with this Commission.

To encourage competition, the Commission should, as it has done previously with great
success, re-open the generic proceeding on performance measures so that all interested
parties can be heard and the issues necessary for an effective performance measures plan
for Georgia can be fully investigated. By doing so, individual CLECs may decide to defer
this very significant issue to the generic proceeding. This would conserve the time and
resources of this Commission while preserving the rights of individual CLECs to arbitrate
the issue under the Act.

To accomplish a generic proceeding with administrative ease, this Commission can utilize
its decisions on performance measurements which have been rendered in the individual
arbitrations, the interim performance measurements plan adopted by Florida and the plans
in place in Texas and New York as a starting point. The parties could then address any
major requirements that should be in place for Georgia and deficiencies in those plans.
Without a hearing to investigate fully the appropriate performance measures plan for
Georgia and whether or not BellSouth’s current SQM is a sufficient plan for Georgia, CLECs
will be left without an adequate remedy for measuring, monitoring, and correcting
BellSouth’s performance. Ultimately, it is the consumer who stands to lose the most
because there be no competitive choices available in the local telecommunications
marketplace.

III. OPERATIONAL SUPPORT SYSTEMS (“OSS”)

1. BellSouth’s OSS do not provide Non-Discriminatory Access to CLECs in Accordance
with FCC Requirements.

In its Interconnection Order, the FCC found that nondiscriminatory access "necessarily
includes access to the functionality of any internal gateway systems the incumbent employs
in performing [pre-ordering, ordering, provisioning, maintenance and repair, and billing]
functions for its own customers." FCC Order No. 96-325 523, n. 1274 (Aug. 8, 1996),
emphasis added (hereinafter “FCC Interconnection Order”). The FCC defined "internal
gateway system" as "any electronic interface the incumbent LEC has created for its own use
in accessing support systems for providing pre-ordering, ordering, provisioning, repair
and maintenance, and billing." FCC Interconnection Order.

The FCC provided greater detail regarding the incumbent LEC's obligation to provide
nondiscriminatory access to OSS functions in its various orders on Section 271
applications from BellSouth and other RBOCs. The FCC explained that incumbent LECs must
provide access to OSS functions that sufficiently supports each of the three modes of
competitive entry strategies established by the Act (interconnection, unbundled network
elements, and services offered for resale) and must not favor one strategy over another.
FCC Order 97-298 133 (Aug. 19, 1997) ("FCC Ameritech Order").

The FCC found that "[f]or those OSS functions that are analogous to OSS functions that an
incumbent LEC provides to itself--including pre-ordering, ordering and provisioning for
resale services--a BOC must offer access to competing carriers equivalent to the access
the BOC provides itself." FCC South Carolina Order 98; see FCC Ameritech Order 139. The
FCC also found that "access to OSS functions must be offered such that competing carriers
are able to perform OSS functions in 'substantially the same time and manner' as the BOC."
FCC South Carolina Order 98. FCC Second Louisiana Order 87.

In addition, the FCC noted that "for those OSS functions that have no retail analogue,
such as ordering and provisioning of unbundled network elements, a BOC must offer access
sufficient to allow an efficient competitor a meaningful opportunity to compete." FCC
South Carolina Order 98; see FCC Ameritech Order 141, FCC Second Louisiana Order 87.
FCC New York Order 83.

The OSS interfaces, processes and functions currently offered by BellSouth do not comply
with the Act and its implementing regulations. Although this Commission has attempted to
identify and address some of the deficiencies with BellSouth’s OSS through the
establishment of Third Party Testing, the utility of the test results have been severely
limited by BellSouth’s original test design and subsequent amendments and supplements to
the test plan. For example, with the exception of two specific tests neither the Master
Test Plan nor the Supplemental Test Plan provides for the comparison of test or CLEC
results to the performance BellSouth provides to its own retail operations. Many test
scenarios proposed originally in the Master Test Plan were removed in later revisions.
One revision removed over 20% of the previously proposed scenarios and another removed
scenarios which called for the tester to access and evaluate CLEC Customer Service Records
following implementation of test orders.

Under the Master Test Plan, proposed and written by BellSouth and approved by the
Commission, CLEC’s were provided with only the ability to provide retrospective comments
on the plan and events identified in either Interim Reports or Exception Reports. This
has deprived CLECs of the opportunity to provide valuable input and reduced the
Commission’s ability to supervise the test and review test results. Interim reports
provide only a limited view of the problems, and KPMG’s OSS testing has by and large
excluded active participation by CLECs. KPMG recently initiated a weekly informational
conference call, but much of the testing occurred prior to the initiation of these
conference calls. Although CLECs have been allowed to comment on KPMG’s reports and
exceptions, these comments are filtered through a process about which CLECs have no
knowledge. Finally, paper comments are insufficient to allow the Commission and CLECs the
opportunity to thoroughly sift through all of the data collected during the test and
determine whether, based upon the results, BellSouth offers CLECs non-discriminatory
access to and use of BellSouth OSS. This determination is essential if the competition is
to develop and be sustained with CLECs relying upon BellSouth’s OSS.

Based upon the few Exception Closure Reports that have been issued to date it appears that
KPMG and the Commission may have accepted BellSouth’s approach of changing documentation
to incorporate system problems, rather than correcting system defects. This approach does
not fix the underlying problem and costs CLECs time and money. Every CLEC, no matter how
large or small, whether providing service through resale, via UNEs, or over its own
facilities, must rely upon BellSouth’s OSS to serve customers. In order to ensure that
BellSouth’s OSS meets the needs of CLECs, this Commission, at the conclusion of the TPT,
should undertake a generic proceeding to examine and correct the remaining deficiencies
with BellSouth’s OSS. Key areas that must be addressed include but are not limited to:
(1) A comprehensive change control process; (2) Fully electronic ordering for retail
services and network elements, with BellSouth to electronically receive and process CLEC
orders without manual processing; (3) Maintenance and repair access; and (4) Additional
OSS improvements to give CLECs the quality of service enjoyed by BellSouth’s retail
customers, such as electronically parsed CSR records and access to loop qualification
information. The following provides a more detailed analysis for each category.


A. BellSouth Should be Required to Provide a Comprehensive Change Control
Process.

The charter for development of a change control process grew out of CLEC complaints to
this Commission regarding inaccuracies and omissions in the information available to them
concerning interfaces that existed in late 1997. Thereafter, BellSouth and several CLECs,
including AT&T, signed the Electronic Interface Change Control Process (“EICCP”) document
("the change control document") in April 1998. The change control document, which was
produced only as a result of regulatory "prodding" of BellSouth by this Commission, is
extremely limited in scope and is insufficient to meet the needs of CLECs. For example, it
encompasses only BellSouth’s existing interfaces and does not apply to new interfaces
until they are deployed. Thus, BellSouth is free to introduce new interfaces without
appropriate notice to and input from the CLECs that will use those interfaces.

In February 2000, BellSouth began developing an Interim Change Control Process (“I-CCP”)
in response to certain findings by KPMG in the TPT. The I-CCP is an evolving work in
progress, and BellSouth is currently replacing the EICCP procedures with I-CCP procedures
in near real-time and often without the full concurrence of the CLECs participating in the
process. While the I-CCP attempts to address the shortcomings of the EICCP, its final
form and BellSouth’s future adherence to its requirements are speculative.

Without a comprehensive, well documented process to handle changes that BellSouth makes to
its interfaces and processes, and their supporting documentation (such as specifications,
business rules, methods and procedures), CLECs cannot make corresponding changes in its
own interfaces and processes, and its customers repeatedly encounter delay and frustration.

Just as BellSouth requires time to make necessary modifications to its systems and
processes, CLECs need sufficient advance notice of such modifications to allow them to
make responsive changes in their own systems and processes, and thereby continue to
provide service to their customers. All too often, CLECs receive little or no notice of
upcoming changes. Similarly, when CLECs request changes to BellSouth’s systems and
processes, there should be an orderly and predictable method by which such change requests
will be handled. Thus, the quality of BellSouth’s Change Control Process directly
affects CLECs ability to offer competitive service to its customers.

BellSouth should be required to incorporate the following attributes in its Change Control
Process:
1. It should cover the following processes:
 changes to manual as well as electronic processes, whether sought by BellSouth or by
CLECs;
 introduction of new interfaces; and
 retirement of existing interfaces.
2. It should provide processes for the following issues:
 exceptions to the Change Control Process;
 defect correction;
 stratification of changes;
 escalation of change requests; and
 dispute resolution.
3. It should allow for monthly meetings between BellSouth and CLECs, with a process for
more frequent meetings if necessary.
4. It should require a firm notification schedule for changes initiated by BellSouth.
5. The process should be legally binding upon BellSouth and subject to regulatory
oversight.
6. The process should include regularly scheduled releases, i.e., quarterly. The schedule
should be provided to CLECs annually.

B. BellSouth Should be Required to Provide the Ability to Submit and Process
Orders Electronically for all Services and Elements.

Lack of electronic ordering increases the possibility of errors and increases costs, and
is discriminatory when compared to the service BellSouth provides itself. It also leads
to service delays as BellSouth takes much longer to return status notices such as
rejections and Firm Order Confirmations for manual orders. Further, BellSouth fails to
provide some status notices such as jeopardy notices and completion notices for manual
orders. Examples of instances in which CLECs require electronic ordering capability are
the UNE Platform, handling of remaining service on partial migrations, use of LSR fields
to establish proper billing accounts, ability to order xDSL loops, ability to order
digital loops, ability to order complex directory listings, ability to order loops and LNP
on a single order, and ability to change main account number on a single order.

CLECs are particularly concerned about the high number of orders placed electronically
that “fall out” of the electronic processing system and therefore require manual
processing. These orders are processed manually by individual employees in one of
BellSouth’s two Local Carrier Service Centers (LCSCs). Individual employees tend to
interpret BellSouth’s business rules subjectively, which results in varying treatment of
similar orders, and orders that are rejected in error. Orders that electronically flow
through BellSouth’s ordering system, on the other hand, are treated the same way and are
rejected or processed on a consistent basis. Thus, a high “fall out” rate (and
conversely, a low flow-through rate) results in a greater number of problem orders. It
also leads to delays as it takes longer to obtain status notices from BellSouth for
manually processed orders. Additionally, the FCC has recognized that low order flow-
through can “indicate a wide range of possible deficiencies in a BOC’s OSS that may deny
an efficient competitor a meaningful opportunity to compete in the local market”. FCC New
York Order 162.

C. BellSouth should provide a full function, machine-to-machine, integrateable
Maintenance and Repair interface.

BellSouth provides two options for electronic trouble reporting. For telephone number-
based exchange services, BellSouth offers access to its proprietary Trouble Analysis
Facilitation Interface (“TAFI”). For both telephone number-based exchange services and
other individually designed services, BellSouth provides electronic trouble reporting
through an electronic communications gateway which BellSouth calls the Electronic
Communication Trouble Administration ("ECTA") gateway. Neither interface provides
equivalent service to that which BellSouth provides itself. TAFI has more extensive
functionality than ECTA, but TAFI is a human-to-machine interface. Consequently, when a
CLEC submits a trouble report via TAFI, that order must be manually entered into the
CLEC's own internal OSS. ECTA, on the other hand, is a machine-to-machine interface, but
does not have the functionality of TAFI. Thus, CLECs must opt for either equivalent
functionality with manual processes or an integrateable gateway that lacks full
functionality, a choice that the Act does not require them to make.

In its preliminary report to this Commission on OSS interfaces dated June 21, 1996
(page 15), BellSouth stated that it "has investigated the possibility of adding to the
existing [EBI] gateway a system called . . . TAFI." In response to BellSouth's
preliminary report, this Commission ordered BellSouth to complete "the TAFI enhancements
to allow full operation of the required access by March 31, 1997." Georgia PSC Order,
Docket No. 6352-U (July 2, 1996). To date, BellSouth has refused to provide that
arrangement.

D. BellSouth Should Provide Additional OSS Improvements to give CLECs the Quality
of Service enjoyed by BellSouth Customers

Specifically, BellSouth should provide CLECs with electronic pre-order xDSL loop
qualification, service inquiry and ordering ability. BellSouth also should provide CLECs
with parsed customer service records for preordering pursuant to industry standards.
CLECs require this functionality to fully integrate their ordering systems with
BellSouth’s, thereby obtaining the functionality now available to BellSouth.

As noted previously herein, it is essential that the Commission address the issues
with BellSouth’s OSS, after the conclusion of the TPT. The CLECs strongly urge this
Commission to hold generic proceedings on this issue.

IV. UNBUNDLED NETWORK ELEMENT COSTS

The Commission Should Open a Generic Proceeding to Review the New
Cost Studies Filed by BellSouth

BellSouth’s recent flurry of cost studies filings undercut the Commission’s
directives in the February 1, 2000 Order in Docket No. 10692-U, Generic Proceeding to
Establish Long-Term Pricing Policies for Unbundled Network Elements
, (“Order”). The
Commission ordered BellSouth to file a cost study for one narrow area, nonrecurring
charges for new UNE combinations:

However, the nonrecurring costs generated by BellSouth’s model may be inappropriate for
those UNE combinations where the elements are not, in fact, currently in place. The
Commission finds, on an interim basis, that for those UNE combinations where the elements
are not currently in place, The nonrecurring charge for such UNE combinations shall be the
sum of the stand-alone NRCs of the UNEs which make up the combination. These interim rates
shall be subject to true-up. Within 45 days of the date of this Order, BellSouth shall
file a cost study for nonrecurring charges for such new UNE combinations. The Commission
shall conduct a review of the cost study.


Order at p. 17. BellSouth’s March 17 filing purported to comply with that Order; however,
it, as well as the cost studies filed on February 9, March 2 and April 28, contains much
more than nonrecurring charges for new UNE combinations. BellSouth’s new cost studies
have changed the situation from one where the Commission had only to review the last piece
part of Docket 10692-U to one where a broad array of proposed new rates and changed rate
structure must be examined.

A review of BellSouth’s recently filed cost studies quickly reveals that they are indeed
different from the cost studies previously filed in Docket Nos. 10692-U and 7061-U.
BellSouth’s new cost studies generate different rates for Voice Grade, advanced services,
DS1 and other high capacity facilities depending on where (i.e., customer location, CLEC
POP, BellSouth CO) the facility originates and terminates. They propose rates for UNEs
not yet addressed by the Commission. For example, in addition to the existing loop types,
BellSouth now proposes the following new UNE loops: DS3 loop, OC3 loop, OC 12 loop, OC48
loop, and STS-1 loop. The nonrecurring charge structure is different from that for
existing loops, which is separated into manual versus electronic ordering but for these,
also bifurcated into installation and disconnection charges. Similarly, new sets of local
channel UNEs, local transport UNEs, loop channelization UNEs, unbundled network
terminating wire, riser cable, line sharing, and subloop unbundling UNEs are proposed as
well as new UNE combinations. Also proposed in these filings are UNEs and services being
considered in Docket No. 11900-U, Investigation of BellSouth Telecommunications, Inc.’s
Provision of Unbundled Network Elements for xDSL Service Providers
. These new UNEs and
services include 2-wire copper (up to 18k feet), 2-wire copper (over 18k feet), 4-wire
copper to 18k feet), 4-wire copper (over 18k feet), unbundled cooper loop (“UCL”), loop
modification, loop testing and loop qualification database.

BellSouth’s cost study filed on February 9 similarly proposed rates for new items in
response to the FCC’s Orders in CC Docket No. 98-147, In the Matters of Deployment of
Wireline Services Offering Advanced Telecommunications Capability
, which included
additional rules regarding collocation for CLECs. Thus, costs are proposed for adjacent
collocation and assembly points, as set forth in Attachment A. The March 2 cost study
also proposed costs for DSLAM collocation in remote terminal and access to DCS, an
important new UNE which provides CLECs access to BellSouth’s network management system in
order to view their assigned digital cross-connects, to have real time reconfiguration for
their circuit connections and allow alarm surveillance of their UNE facility network. In
particular, it allows CLECs to manage DS3, DS1, and DS0 level circuits. These as well as
other components of the new cost studies are set forth in detail in Attachment A to this
Petition.

Moreover, even as to non-recurring charges for “new” combinations of network elements, it
is not clear that BellSouth has complied with the Commission’s Order. Without any
narrative description whatsoever, BellSouth simply modified its rate structure to include
non-recurring rate elements for “new” combinations in addition to the rates established by
the Commission for “currently combined” elements. Without knowing just what BellSouth
means by “new combinations” and “currently combined” combinations, it is impossible to
determine (1) whether this new rate structure complies with the Commission’s Order or (2)
whether the cost studies for the new non-recurring rates are appropriate or accurate.

Thus, BellSouth’s three recently filed cost studies include new rates for certain new
services and network elements which the Commission has not determined to be cost-based and
which do not appear to be in compliance with the methodology approved by the Commission.
Although this Commission indicated in the February 1, 2000 Order in Docket 10692-U that
any new cost studies would be reviewed, BellSouth apparently disagrees. According to
BellSouth, “The prices contained in the SGAT, which mirror the cost study results, became
effective sixty days after the filing of the revised SGAT. Therefore, the Commission need
not take action to establish prices for these network elements because permanent prices
are already in effect.” The Commission cannot allow BellSouth to unilaterally change the
pro-competitive terms of the combinations of network elements order by filing non-
compliant cost studies which have not been reviewed or adopted and would hinder CLEC entry
into the local market.

Their breadth warrants full review of the new items in a generic docket, although it would
be appropriate for the examination of xDSL costs to be continued in Docket 11900-U. These
new BellSouth cost studies are a significant departure from those previously considered by
the Commission, making it all the more urgent that they be fully reviewed in a docket
devoted to that purpose.

V. COLLOCATION

1. BellSouth has Failed to Make Space Available to CLECs for Cageless
Collocation

CLECs continue to have difficulties establishing collocation in offices. As an incumbent
LEC, BellSouth is required by Section 251(c)(6) of the Federal Telecommunications Act of
1996, to provide physical collocation in both “caged” and “cageless” forms except where
BellSouth “demonstrates to the State commission that physical collocation is not practical
for technical reasons or because of space limitations.”

Indeed, BellSouth is required to provide, on terms and conditions that are just,
reasonable, and nondiscriminatory, any technically feasible method of obtaining
interconnection or access to unbundled network elements at a particular point upon a
request by a telecommunications carrier. In order to be in compliance with this
requirement, BellSouth must demonstrate to the Commission that collocation is not feasible
for technical reasons or because of space limitations. BellSouth routinely fails to
adequately demonstrate the basis for its denial of collocation due to space limitations or
provide evidence that physical collocation cannot be accomplished for technical reasons.
Moreover, BellSouth must, upon request, remove obsolete unused equipment from their
premises to increase the amount of space for collocation. BellSouth has not complied
with this requirement.

The law provides that while BellSouth, as an ILEC, may retain a limited amount of
floor space for its own specific future uses, BellSouth may not reserve space for future
use on terms more favorable than those that apply to other telecommunications carriers
seeking to reserve collocation space for their own future use. However, BellSouth
routinely reserves floor space for its own future use, without furnishing forecasts or
other information to support that such space reservation is appropriate and not on more
favorable terms that those applied to CLECs. Forecasts are essential to determining
whether or not collocation space is available. As such, the circuit, facilities, and
switching forecasts, as well as the engineering diagrams and Demand and Facility Charts
that were used in making the determination that collocation space was not available must
be supplied by BellSouth if it is to be properly determined that collocation space is, or
is not, available.

2. BellSouth has Failed to Provision Collocation at Reasonable Intervals
One of the most critical issues regarding collocation is the time period between the date
a CLEC submits a final order for collocation and the date BellSouth physically provisions
the collocation arrangements. Despite mounting authority directing ILECs to provision
cageless and shared collocation at intervals reflective of the time needed to complete the
work necessary to establish such arrangements, BellSouth clings to its position that
collocation arrangements (regardless of the form) must only be provisioned within 90
business days of the date upon which an order is confirmed by a CLEC. Moreover, BellSouth
takes the position that in “extraordinary” or “special” circumstances it can take an
additional 30 business days. There is simply no justification for such a long
provisioning interval. BellSouth will undoubtedly attempt to mitigate the Commission’s
concerns regarding this issue by suggesting that it will provision collocation “as soon as
possible” after a firm order is submitted. While this promise is certainly encouraging,
such an unenforceable standard simply cannot form the basis of a CLEC’s plans for, service
in a particular area and should not form the basis of a Commission established interval.

BellSouth takes the position that the proper interval for provisioning collocation
should be 90 to 130 business days. In an effort to construct a barrier to the utilization
of cageless collocation in Georgia, BellSouth has suggested that the same intervals needed
for caged separate collocation arrangements are applicable to all collocation. This
position strains credulity. The 90 to 130 business day interval assumes space
identification, build-outs of enclosures, power and HVAC, all of which are not necessary
in a cageless environment. Furthermore, pursuant to the Advanced Wireline Services
Order
, the FCC has directed ILECs to identify existing space to make cageless
arrangements available before applications for cageless collocation space are submitted.
Specifically, the Advanced Wireline Services Order states that BellSouth must make
collocation space available “without waiting until a competing carrier requests a
particular arrangement so that competitors will have a variety of collocation options from
which to choose.” See 40, Advanced Wireline Services Order. If BellSouth fulfills this
duty, which is imposed upon it by the FCC, cageless collocation can be provided to
competing carriers without significant delay.

The FCC emphasized the importance of the timely and efficient provisioning of
cageless collocation at 54 of the Advanced Wireline Service Order. Indeed, the FCC
encouraged this Commission to adopt specific intervals and implies that such intervals
should be markedly shorter than those for more cumbersome forms of collocation which
require separate space. See Advanced Wireline Services Order, 38. Cageless collocation
is akin to virtual collocation. Indeed, without examination of serial numbers or
equipment ownership labels, even a telecommunications engineer could not distinguish
virtual collocation arrangements from cageless collocation arrangements in a central
office.

Other state commissions have examined this issue and established cageless
collocation intervals that are substantially less than BellSouth’s. For example, the
Texas Public Utility Commission has established, for active collocation space, a cageless
collocation interval of seventy (70) days where Southwestern Bell installs the bays/racks
and fifty-five (55) days where such work is done by the CLEC. The Utah Commission,
pursuant to Utah Regulation R746-365-3(c)(iv) (Network Guidelines Applicable to All
Telecommunications Corporations), requires that collocation arrangements must be completed
by an ILEC within forty-five (45) days of the telecommunications corporation’s acceptance
of the ILEC’s quotation.

More recently, the Virginia Corporation Commission Staff filed its report and
recommendation that the provisioning intervals for cageless collocation for space that is
already conditioned should be comparable to that of virtual collocation of equipment in a
premise. The Virginia Staff also recommended that Bell Atlantic must provide cageless
collocation within an interval of sixty (60) calendar days. The Louisiana Public Service
Commission Staff has also recently recommended a 60-day interval for the provision of
cageless collocation for the interconnection agreement between ITC^DeltaCom and BellSouth.

3. BellSouth’s Rates for Collocation are Not Cost Based
The Commission has done a commendable job in establishing a $100 per square foot recurring
rate for collocation space. However, BellSouth’s imposition of other charges that it
deems necessary to provision collocation in Georgia continue to act as a barrier to local
entry by CLECs. In particular, BellSouth’s application charge has no relationship to the
cost of processing an application. For CLECs seeking to establish collocation
arrangements in only a few central offices in Georgia, an above-cost application charge
may not completely bar entry but could hinder the Commission policy of facilitating
widespread deployment of telecommunication services, often accomplished through
collocation arrangements.

With regard to rates for cageless or shared collocation, BellSouth has never submitted a
cost study to the Commission. The Commission should establish interim rates for cageless
collocation immediately that are based on BellSouth’s rates for virtual collocation with
adjustments to remove charges for installation, maintenance and repairs and training. The
FCC’s description of cageless collocation mirrors the characteristics of a virtual
collocation arrangement. The exception is that under a virtual collocation arrangement,
the CLEC does not have physical access to the ILEC premises and their equipment is under
the physical control of the ILEC (including installation, maintenance and repair
responsibilities). From a cost and rate perspective, the characteristics of a virtual
collocation arrangement is the same as a cageless collocation or shared collocation
arrangement. The party paying the maintenance engineer would be the only means for
determining whether it was a virtual collocation (BellSouth would be paying for
maintenance) or cageless collocation (the CLEC would be paying for the maintenance
directly). The CLEC is also responsible for training and repair charges in a cageless
collocation arrangement. Under cageless collocation, therefore, BellSouth will incur less
cost than under virtual collocation.

Thus, calculations of the rates that may be charged for cageless collocation are
relatively simple. The Commission should utilize the BellSouth rates for virtual
collocation with adjustments to remove charges for installation, maintenance and repair
and training. Those functions are to be performed directly by the CLEC and thus the costs
are to be borne directly by the CLEC, not the ILEC. These rates should remain in effect
in the absence of a cost study performed specifically for cageless collocation--
something BellSouth has not done. This is exactly the approach recently adopted by the
Tennessee Regulatory Authority in the ITC^DeltaCom arbitration with BellSouth. BellSouth’s
position is that the rates for physical collocation should apply to cageless collocation.

4. A Separate Proceeding Should be Established To Address Collocation
Given the stark, undisputed factual differences between physical caged and cageless or
shared collocation, it is obvious that using physical “caged” or “walled” collocation
rates would greatly overstate the actual costs to BellSouth and using the same
provisioning intervals is equally inappropriate. BellSouth should be required to produce
a collocation cost study that specifically relates to cageless forms of collocation and
takes into account the FCC’s requirement that ILECs perform certain functions prior to
application for a collocation arrangement that can be scrutinized by the Commission and
CLECs. This should be done as soon as possible. Similarly, a separate docket for
establishment of collocation policies regarding intervals for ordering and provisioning
and rates is the appropriate procedure to address the myriad of issues CLECs face in
serving local customers on a wide scale basis. Until such docket is concluded, the rates
for shared and cageless collocation should be the same as those for virtual collocation,
adjusted to remove costs related to installation, maintenance and repair and training.
Moreover, the provisioning intervals should be set at a maximum 30 calendar days.

ATTACHMENT A


OUTLINE OF EXISTING (APPROVED BY THE GPSC) AND PROPOSED UNEs (BELLSOUTH’s 2/9, 3/2
and 3/17 FILINGS)


I. Local Loop
Definition: An unbundled local loop provides a transmission path and associated
electronics between the BellSouth SWC and the CLEC’s customer’s premises. Local loop
facilities are dedicated to a single customer.

A. Existing Loop Types (includes NID)

1. 2 wire Voice Grade SL1 (non-designed)
2. 2-wire Voice Grade SL2 (designed)
3. 4-wire Voice Grade
4. 2-wire ISDN
5. 2-wire ADSL Capable
6. 2-wire HDSL Capable
7. 4-wire HDSL Capable
8. 4-wire DS1

Rate structure for all existing Loops is fixed monthly facility termination charge and
distance sensitive monthly per mile charge. Nonrecurring charges are bifurcated by Manual
Ordering or Electronic Ordering.

B. Proposed UNE Loops (proposed in 3/2 filing)

1. 2-wire Copper - Up to 18kft
2. 2-wire Copper - Over 18kft
3. 4-wire Copper - Up to 18Kft
4. 4-wire Copper - Over 18Kft

Unbundled Copper Loop (UCL) description: Physical transmission facilities (or channel or
group of channels on such facilities) which extend from the main distribution frame (MDF)
connection in the end office to a demarcation point at the customer premises (i.e. the
NID). The facilities are provided as designed circuits and include test points. These
loops are commonly referred to as “dry copper” loops because they have no intervening
equipment such as load coils, bridged tap, repeaters, etc. between the customer premises
and the MDF connection. The Unbundled Copper loop does not support any particular service
and is not guaranteed to provide any specific performance standard.
5. DS3 Loop
6. OC3 Loop
7. OC12 Loop
8. OC48 Loop
9. STS-1 Loop

Proposed rate structure for all new Loops is fixed monthly charge per facility termination
plus a variable distance sensitive per mile charge. Nonrecurring charges are bifurcated
into installation and disconnection charges which are also bifurcated in manual versus
electronic ordering.

II. Local Channel

Definition: An unbundled local channel provides a dedicated transmission path and the
associated electronics between the BellSouth SWC and the CLEC POP, Point of
Interconnection or collocation.

A. Existing UNE Local Channels

1. 2-wire Voice Grade
2. 4-wire Voice Grade
3. DS1

Rate structure for existing UNE Local Channels are fixed facility termination monthly
charges. No distance sensitive per mile charge. Nonrecurring charges are dependent on
electronic versus manual ordered.

B. Proposed UNE Local Channels (proposed in 3/2 filing)

1. DS3 Local Channel
2. OC3 Local Channel
3. OC12 Local Channel
4. OC48 Local Channel
5. STS-1 Local Channel

Proposed rate structure for new UNE local channel include fixed facility termination
monthly charge, plus a variable distance sensitive per mile charge. The proposed
nonrecurring charge rate structure is dependent on electronic versus manual ordered and is
also separated between installation and disconnect.

III. Local Transport

Definition: Unbundled interoffice transport provides a transmission path and associated
electronics between BellSouth’s end offices so that CLECs can transport traffic from one
location to another.

A. Existing Local Transport UNEs

1. Common Transport per mile per mou, and per mou per termination.
2. Dedicated Voice Grade, monthly facility and per mile monthly
3. Dedicated DS0 56/64 Kbps, monthly facility and per mile monthly
4. Dedicated DS1, monthly facility and per mile monthly

Nonrecurring charges are dependent upon manual versus electronic ordered.

B. Proposed Local Transport UNEs (Proposed in 3/2 filing)

1. DS3 Transport
2. OC3 Transport
3. OC12 Transport
4. OC48 Transport
5. STS-1 Transport

Proposed rate structure for new UNE transport include fixed facility termination monthly
charge, plus a variable distance sensitive per mile charge. The proposed nonrecurring
charge rate structure is dependent on electronic versus manual ordered and is also
separated between installation and disconnect.

IV. Loop Channelization

Definition: Provides the multiplexing capability that allows a DS1 or DS3 UNE or
collocation cross connect to be channelized at a BellSouth Central Office. A multiplexer
or a digital cross connect system accomplishes this. Channels can be activated for the
entire system or on an as-needed basis once he basic channelization has been installed.

A. Existing Loop Channelization

1. Digital Loop Carrier System
2. CO Channel Interface - 2-wire voice grade

B. Proposed Loop Channelization UNEs (Proposed in 3/2 filing)

1. DS1 to DS0 Channel System

a. OCU-DP Card DS1 to DS0 Interface Unit
b. BRITE Card DS1 to DS0 Interface Unit
c. Voice Grade Card DS1 to DS0 Interface Unit

2. DS3 to DS1 Channel System

a. DS3 to DS1 Interface Unit

Proposed Rate structure: Fixed monthly rates with installation and disconnect
nonrecurring charges.

V. Proposed Sub-Loop UNEs (Proposed in 3/2 filing)

BellSouth has proposed sub-loop unbundling of the feeder and distribution portion of its
existing ISDN, ADSL, HDSL, 56/64 Kbps loops (voice grade loops already have sub-loop
distribution and feeder unbundled) and new Unbundled Copper Loops.

VI. UNE Combinations

A. Existing UNE Combinations

1. 2-wire Voice Grade Loop - 2-wire Line Port
2. 2-wire Voice Grade Extended Loop - DS1 Dedicated Interoffice Transport
3. 4-wire Voice Grade Extended Loop - DS1 Dedicated Interoffice Transport
4. 4 wire 56/64 Kbps Extended Digital Loop - DS1 Dedicated Interoffice Transport
5. Extended 2-wire Voice Dedicated Local Channel - DS1 Dedicated Interoffice Transport
6. Extended 4-wire Voice Dedicated Local Channel - DS1 Dedicated Interoffice Transport
7. Extended 4-wire DS1 Loop - DS1 Dedicated Interoffice Transport
8. Extended 4-wire DS1 Loop - DS3 Dedicated Interoffice Transport
9. Extended DS1 Dedicated Local Channel - Dedicated DS3 Interoffice Transport
10. 2-wire Voice Grade Loop - 2-wire Line Port
11. 2-wire Voice Grade Extended Loop - DS1 Dedicated Interoffice
Transport

B. Additional proposed UNE combinations (proposed in 3/2 filing)

1. 2-wire Design Loop - Line Side Port
2. 4-wire Design Loop - Trunk Port

C. “Newly” combined UNEs (proposed in 3/17 filing)

BellSouth’s March 17, 2000 filing was a response to the Commission’s order in Docket No.
10692-U that requested cost studies for UNE combinations that are not ordinarily combined
by BellSouth. BellSouth maintains that existing UNE combinations cost one thing and UNE
combinations that do not currently exist (i.e. that they have to put together at the time
of the CLEC order) have an additional charge. As such, BellSouth has proposed additional
nonrecurring charges for all UNEs that are newly combined.

VII. Other proposed offerings (proposed in 3/2 filing)

A. Loop Modification

Description: Deconditioning a copper loop through the removal of equipment such as load
coils, low-pass filters, range extenders and/or removing bridged taps that have been
attached to the copper loop.

B. Loop Testing (proposed in 3/2 filing)

Description: By request of a CLEC, BellSouth will provide testing services beyond voice
grade transmission for an identified line’s features, functions and capabilities. The
testing function is based on a trouble reported on a conditioned line previously ordered
by the CLEC.

C. Loop Qualification Database (proposed in 3/2 filing)

Description: Mechanized interface to loop make-up information that generates preordering
transactions. Loop Facilities Assignment and Control System (LFACS) will contain loop
qualification data composed of loop material, including but not limited to: fiber optics
or copper; the existence, location and type of any electronic or other equipment on the
loop, including but not limited to, digital loop carrier or other remote concentration
devices, feeder/distribution interfaces, bridge taps, load coils, pair-gain devices in the
same or adjacent binder groups; loop length, wire gauge and electrical parameters of the
loop. BellSouth proposes .9916761 per query charge.

D. Unbundled Network Terminating Wire
Description: Unbundled Network Terminating Wire (UNTW) is unshielded twisted copper
wiring that is used to extend circuits from an intrabuilding network cable (INC) terminal
or from a building entrance terminal to an individual customer’s point of demarcation. It
is the last segment of the field-side loop distribution facilities which in multi-
subscriber configurations, represents the point at which the network branches out to serve
individual subscribers.

This element provides a communication pathway from the CLEC to the end user’s wire. This
facility will allow an end user to send and receive telecommunications traffic when it is
properly connected to the CLEC’s required network elements such a loop distribution
facility, loop feeder facility, or NID.

This element will be provided in Multi-Dwelling Units (MDUs) and/or Multi-Tenants Units
(MTUs) where BellSouth provides wiring all the way to the end users premises.

E. ODUF, ADUF, EODUF (proposed in 3/2 filing)
Optional Daily Usage File (ODUF), Access Daily Usage File (ADUF) and Enhanced Optional
Daily Usage File (EODUF). Data charged for per message or per tape.
Description: Access Daily Usage File (ADUF) is a service that provides electronic data
of billable messages recorded on the BellSouth network and processed in the BellSouth
Customer Record Information System (CRIS) billing system (UNE only). ADUF provides daily
information of end users’ originating and terminating access Carrier messages. ADUF data
is billable access detail messages in industry standard Exchange Message Interface (EMI)
format.

Enhanced Optional Daily Usage File (EODUF) provides usage data for local calls originating
from resold Flat Rate Business and Residential lines.

Optional Daily Usage File (ODUF) is a service that provides electronic billing data for
billable messages carried over the BellSouth network, processed in the BellSouth CRIS
billing system and billed to BellSouth CLEC customer. The ODUF file also includes
electronic billing data for operator handled calls originating from CLEC subscriber lines
for those CLECs who purchase Operator Services from BellSouth. Rated Incollects
(originated in BellSouth and from other companies) can also be on ODUF.

F. Physical Collocation - Security Access System (proposed in 2/9 filing)

Description: A card reader access system that allows entry to the central office with an
approved card while tracing and recording the times of entry of the cardholder.

G. Adjacent Collocation (proposed in 2/9 filing)

Description: Adjacent collocation is outside the BellSouth CO but on BellSouth adjacent
property. BellSouth will provide adjacent collocation arrangements where space within the
CO is “legitimately” exhausted. floor space, AC power to adjacent site, 2-wire, 4-wire,
DS1, DS3, 2-fiber and 4-fiber cross connects, and 120V & 240V single phase and three phase
standby power are offered.

H. DSLAM Collocation in Remote Terminal (proposed in 3/2 filing)

Description: This UNE unbundles the high frequency portion of the local loop at the
remote terminal. While CLECs can use this UNE to provide xDSL based services, the loops
remaining transmission frequencies continue to provide voice grade service from
BellSouth. For each loop, BellSouth provides this UNE only to a single requesting carrier
and only for use at the same customer address. BellSouth will not provide this UNE if
BellSouth does not currently provide analog voice service to the end user. A CLEC is
provided a 1 ¾” of vertical rack space (monthly fee and nonrecurring installation fees)
and a $1.66 monthly cost per line activation (plus nonrecurring installation ($328)and
disconnect($57) fees. BellSouth has proposed that the CLEC incurs on a recurring and
nonrecurring charge per line for each end user loop cross connected by BellSouth at the
splitter.

I. Assembly Points (proposed in 2/9 filing)

1. 2-wire Cross Connects
2. 4-wire Cross Connects
3. DS1 Cross Connects

Description: An assembly point provides an alternative method for CLECs to connect to
BellSouth’s UNEs. Offers CLECs the ability to recombine UNEs themselves at an assembly
point location. Rates for assembly point cross connects are different than the rates for
collocation cross connects.

J. Access to DCS - Customer Reconfiguration (proposed in 3/2 filing)

Description: Access to Network Management systems that allows CLECs to view their
assigned digital cross connect within the BellSouth network, to have real time
reconfiguration for their circuit connections and alarm surveillance of their UNE facility
network. This UNE allows CLECs to manage DS3, DS1 and DS0 level circuits. Provide secure
access to a CLECs elements to receive alarms and to send commands for reconfigurations.

VIII. Missing Items

A. Line Sharing at Central Office
B. Geographically Deaveraged Loop rates


CONCLUSION

Now is the ideal time for this Commission to push BellSouth to solve issues that
discourage CLECs from entering the local market. Workable OSS and meaningful updated
performance measurements with self-executing remedies must be solidly in place for any
CLEC to invest the resources needed for mass-market entry. Hearings for a full airing of
these and other issues noted herein are needed.

The Commission should focus on solving these issues and not be distracted by some of the
271 related pleadings that BellSouth has filed. To further competition, this Commission
should establish generic proceedings to review and adopt effective Performance
Measurements and Penalties, cost based rates for all network elements, address collocation
issues, and at the conclusion of the TPT, improvements to BellSouth’s OSS. Comprehensive
proceedings would assure this Commission, CLECs and Georgia customers that when a customer
switched their telecommunications carrier from BellSouth to a CLEC, it could be done
seamlessly and without any interruption of service. Only when this occurs can full-scale
market competition grow and flourish in Georgia.

This __ day of May, 2000.

(CLECs Signed)