Home
> Electronic Reading
Room
> Document
Collections
> NRC
Regulations (10 CFR) > Part
Index > § 60.3 License Required
§60.3 License required.
(a) DOE shall not receive or possess source, special nuclear, or
byproduct material at a geologic repository operations area except as
authorized by a license issued by the Commission pursuant to this
part.
(b) DOE shall not commence construction of a geologic repository
operations area unless it has filed an application with the Commission and
has obtained construction authorization as provided in this part. Failure
to comply with this requirement shall be grounds for denial of a
license. |